Gold Member Since 2013
Audited Supplier
Qingdao TTWY International Trade Co., Ltd.

Extruder, Plastic Machine, Plastic Machinery manufacturer / supplier in China, offering Plastic PVC/PP/PE/PC Sheet Production/Extrusion Line, S1408 Rotor Sand Mixer Birotor, Alumina Ceramic Crucibles with High Quality and Competitive Price and so on.

(/ )

Supplier Homepage Product Plastic Profile Extrusion Line Plastic PVC/PP/PE/PC Sheet Production/Extrusion Line

Plastic PVC/PP/PE/PC Sheet Production/Extrusion Line

FOB Price: US $10,000-90,000 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $10,000-90,000/ Set
Get Latest Price
Production Capacity: 30sets/Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: To order
  • Automation: Automatic
  • Certification: CE, ISO9001:2008, SGS
  • Trademark: TTWY, OEM, ODM
  • Origin: Qingdao China
  • Product Type: PVC Profile
  • Computerized: Computerized
  • Size: Customized
  • Specification: CE, SGS
  • HS Code: 8477209000
Product Description

Introduction:

By adopting the foreign and domestic advanced technology, we successfully developed the small profile extrusion line. This line consists of Single Screw Extruder, Vacuum Calibration Table, Haul-off Unit, Cutter and Stacker, the producing line features of good plasticization, high output capacity, low power consumption and etc. The main extruder speed controlled by imported AC inverter, and temperature control by Japanese RKC or FUJI temperature meter, vacuum pump and traction gear reducer of the down stream equipment are all good quality products, and also easy maintenance.

Main Technical Parameters:

 Model YF50 YF108 YF180
 Max. width of product (mm) 50 108 180
 Extruder Model SJSZ 45/100 SJSZ 45/100 SJSZ 55/110
 Total Power (kw) 18 26.1 31.6
 Cooling water (m3/h) 5 5 7
Compressed Air (m3/min)  0.5 0.6 0.6
Technology and Service:         
1,Seller supply full set of technical document, cutter and other full document (write in English).  
2,Seller supply training for buyer's staff until buyer can produce the eligible product independently.  
3,Seller is responsible for installing, testing, adjusting and debugging the machines in buyer's factory.
4,Buyer should pay the expense for our engineers including for round-way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5,Seller will go to install machines after the machine is arrived at buyer's ground and buyer will have prepared all conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing and testing these machines. Buyer should pay 100USD/day for each technician.
6,When installing, people of both sides cooperate friendly, buyer supplies convenient working condition,any problem, should discuss peacefully and kindly.
7,Buyer supply proper working tools, equipments and other conditions.
8,The expense including the accommodation and materials of the trial-run the machine for testing and other expenses(electric, water, air and worker) will be on seller's account, if the buyer or their representatives do the inspection of the machines before shipment.
9,Guarantee period: 12 months
Send your message to this supplier
Avatar
Miss Anni
Manager
*From:
To: Miss Anni
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now