Customization: | Available |
---|---|
Feature: | Corrosion Resistance, High-Thermal Conductivity, Thermal Shock Resistance |
Manufacturing Technique: | Compression Moulding |
Still deciding? Get samples of US$ 10/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material: Specialty Graphite
Purity: 99.99%
Molding Process: Compression Molding
Parameter Name | Specification Range |
---|---|
Material | Specialty Graphite |
Operating Temperature | ≤2500ºC |
Density | ≥2.2g/cm³ |
Purity |
≥99.9% |
Use an appropriate base (same material and equivalent size). Allow the crucible to expand and contract. The furnace cover should not be pressed on the crucible. In the resistance furnace, the fiber blanket should not be tightly compressed onto the crucible. The lining must be repaired and made as concentric as possible, which will prevent the flame in the flame heating furnace from deflection and impact on the crucible to ensure correct melting.
Preheating and maintenance (furnace temperature)
> Preheat for 3 hours at a constant temperature at 200 degrees;
> Preheat at a constant temperature of 700 degrees for 2 hours;
> Preheat at a constant temperature of 900 degrees for 1 hour;
> Shut down the furnace to cool the crucible to no redness;
> Then the temperature is raised to the normal aluminum melting/feeding temperature and the feeding is added in a vertical direction of 90 degrees.
Notes of operating crucibles
> The crucible should be stocked in the dry situation;
> Carry the crucible lightly;
> Warm the crucible in the drying machine or near the furnace. The warming temperature should be up to 500ºC;
> The crucible should be put under the furnace month flat;
> When put the metal into the crucible, you should take the crucible capacity as your reference. If the crucible is too full, it will be damaged by expansion;
> The clamps shape need as that of crucible. Avoid the concentrate stressed destroy of the crucible;
> Clean the crucible regularly and lightly;
> The crucible should be put in the center of the furnace and leave some distance between the crucible and furnace;
> Turn the crucible once in one week and this way can keep the service life;
> The flame should not touch the crucible directly;
> 24 hours constant use will make crucibles have longer service life;
The smelt soup in the crucible should be cleared out when the furnace stop working, in order to avoid molten soup solidificating and will be expanded when fire to reheat, and affect the service life of crucible or even burst.
> We suggest that about 2 months for crucible melting aluminum alloy (every week for melting copper alloy), hanging out to check whether there is something wrong in the surface, and clean furnace hearth as well as turn the crucible, this operation ishelpful to prolong the service life of crucible.
In order to protect the glaze layer of the crucible, handling crucible must be very careful, to avoid knocking, collision or falling, we can't put the crucible on the ground and rolling to transport. Once the glaze layer of crucible is damaged, it will lead to oxidation and aging of crucible easily in the process of use. The crucible should be handled carefully in a padded cart (or other suitable conveyer).
Our company use rope, rubber, moisture-proof plastic paper, shockproof to pack the crucible, and according to customers' needs, we can customize wooden cases, export packaging cartons, paper tubes, etc., to ensure that the crucible wouldn't be damaged in transit.
Qingdao TTWY Manufacturing Co.,Ltd is a company specialized in producing casting equipment. It is located in Qingdao,a beautiful harbor city,which is convenient in transportation. Especially in graphite products, for expamle, the graphite electrode, graphite crucible, clay graphite crucible,
Isostatic graphite crucible, etc;
Q1: What information should I let you know if i want to get a quotation?
A: The required material dimension (Thickness*Width*Length,diameter*length; if possible, please kindly supply us drawings).
The required more information, such as Surface Condition, Tolerance Request, The Quantity, and other mechanical and technical details.
If it is possible, please also provide the application of products, we will recommend the most suitable products with details for confirmation.
Q2: How do you gurantee the quality of the products?
A: Each step of production and finished products will be carried out inspection by QC department before storing in the warehouse. NG goods are not allowed in the completed goods warehouse.
Q3: Can you guarantee the prompt delivery?
A: Yes, when we get your inquiries, not only we will evaluate the more competitive price, but also we can get the most reasonable delivery time. So the prompt delivery can be guaranteed.
Q4: What is your lead time?
A : It usually needs about 15- 20 days after receiving the PO.
Q5 : What is your payments terms?
A : T/T, L/C, Western Union, etc., could be acceptable.
Q6 : Can we visit your company?
A : Yes, for sure, It's my pleasure to visit our company.
Q7 : What is the shipping cost?
A: The shipping cost is determined by the destination port, weight, packing size, total CBM of the products, we will try best to get the most reasonable shipping cost from the forwarders or express couriers to help you save more money.
Q8 :What is the transportation way?
A:If the Gross Weight ≤45kg, it's better by express such as TNT, DHL, FedEx,, etc.
If the Gross Weight between 45kg to 100kg, by express or by air to your nearest airport can be both considered.
If the Gross Weight ≥ 100kg ,you can choose by Air or Sea to the nearest port.
Q9 :How service you can offer your clients?
A:We provide presales service in various forms, for example, making investment budget,manufacturing planning,etc.so that customer make a reasonable plan with less cost. Moreover,we will also provide after sale service ,for example,free training about machine applications ect.